242
Cbs
stick of the same description costs .98 and for stone supervision .38 – $1.26 Ch.
On the Sai-wan Road, the work has been chiefly executed by day work, excepting the bridges which are let by Contract, and some portions, where the work was more expensive and at the same time better calculated for let by small Contracts or "piece work jobs" at lumpsum prices.
The proportion out of the first Estimate for $15,000 that was carried out on this system, was as follows.
Bridges $2290
Sea Wall, too kuna poo @ 1.75 pr. ft. 8290.60
Dr beyond do. @ $1 for ft.
Sundry Contracts 1156 1247.38
A direct comparison of the cost with the length of Road executed, would lead to an inaccurate result.
An approximate comparison of the cost of the Contract Work and of that by day work may be obtained by referring to the ultimate wages paid under Contract, as compared with the ordinary rate for day work;
The ordinary rate of wages at day work, is 7) (labourers = .18. 3 Masons
On the torkur poo Sea Wall Alvong Contractor employed 3414/labourers and received for 345 ft run of wall @ 28 c/ft: $690 524 @ 1.75 = 917
869 1607 cost of Stone and Beating 15.7374
Cost of Labour Mason 867 $737 4.4
As the work comprised in these Contracts was of a different and more costly description than any other parts of the line;
Afony Contractor employed 2034 men and received for 862 ft @ 51.75 1683.50
Lefs
€
242
Cbs
stick of the same description costs. 98
and for stone supervision. 38 – $1.26 Ch.
On the Sai-wan Road, the work has been chiefly executed by day work, excepting the bridges
which
are
let by Contract, and some portions,
where the work was more expensive and at
the same time better calculated for let
#
Plotting
in small Contracts or "picce work jobs "at
ement prices.
The proportion out of the first Estimate
for $15,000 that was carried out on this :system, was as follows.
Bridges
$2290
Sea Wail, too kuna poo@ 1.75 pr. ft. 8290.60
Dr beyond do. @ $1 for ft.
Sundry Contracts
1156
1247.38
удал
a
direct) comparison of the cost with the bugth
of Road executed, would lead to
result, tint an
an inaccurate.
an approximate comparivon of the
cost of the Contact Work and of that by dany
be obtained by referring to the
werk ·
may
ultimate wages,
wages paid unde. Contract, as compared
with the ordinary rate for day work; three :
The ordinary pak op wages at day work, is
7) (relies = 18. 3 Masons
On the torkur poo Sea Wall
Alvong Contractor employed 3414/bertad
and recurred for 345 fi run of wall
(a 28 fo+ft: $690
524 @ 1.75-8917_
atti
pe
869
1607
cost of Stone and Beating
15.7374
-eje cest of
Lectus Mason
867
$737
4.4
As the wok comprized in these
Contracht was of a different nd more costly
description than.
atvy
other parts of the lirie;
Afony Contractor employed 2034 nun
and received for 862 fr & 51.75 1683.50
a
Lefs